The Craggy Gardens Visitor Center at milepost 364 which never opened last year will reopen as will one lane of the parkway. Visitors can expect delays as the traffic will alternate using the one open lane.
Weather could impact the opening date, and is always a factor in closing sections of the parkway. Locally, the highest section of the Blue Ridge Parkway between Asheville and Cherokee continues to be closed for winter, though I expect it will open any day now. We’ve had a sustained period of warmer weather which should have allowed the ice to clear from the dozen or more tunnels that grace this rugged and beautiful southern portion of the road. It’s not so much the snow that’s a problem here, but the accumulation of ice which persists in the cool shade of the tunnels long after the days have warmed.
Barring any significant slides which need attention, the gates should be unlocked soon.
Wayne@americaridesmaps.com>> Go to America Rides Maps.com – http://americaridesmaps.com